Construction crane and building wireframe
Construction Intelligence

Construction Coordination, Powered by AI

One platform that connects drawings, RFIs, emails, ITPs, site photos and teams—powered by a Construction Knowledge Graph and AI agents.

Setubase knowledge graph connecting emails, WhatsApp, PDFs, drawings, and site photos to AI clash detection for a pipe through beam on level 12
Building now
Dashboard·Files·Transmittals·Issues·RFIs·Instructions·NCRs·Variation Orders·ITPs·Submittals·Forms·Lookahead·Site Diary·Photos·Chat·Safety·Graph·Companies·Team·Information·Dashboard·Files·Transmittals·Issues·RFIs·Instructions·NCRs·Variation Orders·ITPs·Submittals·Forms·Lookahead·Site Diary·Photos·Chat·Safety·Graph·Companies·Team·Information·
The coordination problem

Everything's documented.
Nothing's connected.

The drawing was right. The email was clear. The pipe is still through the beam. Information was documented — it just never traveled between systems.

The drawing was right.

The email was clear.

The pipe is still through the beam.

No single person or tool had the full picture. That's how a $36k-a-day delay hides in plain sight.

28%

of project value lost every year.

Procore, 2024

9%

over budget. Every project.

Dodge, 2024

18%

of the workday lost just searching.

Procore, 2024

Not bad people. Not bad plans. Information that loses its context at every hop.

See it in action

One dashboard. Every signal that matters.

While your team works, Setubase tracks what's on time, what's at risk, and what needs action — surfaced by AI before anyone has to ask.

Live project metrics

Timeline, budget, and phase — always current, no manual update.

AI risk signals

NCRs, overdue RFIs, and blockers flagged before they become delays.

Action-required queue

Everyone sees exactly what needs resolving, prioritised by impact.

Recent activity feed

Every change and sign-off, timestamped and traceable in one stream.

app.setubase.com/tower-a/ai-agent
Setubase project dashboard — timeline, open items, NCRs, budget, action queue, and AI project intelligence
Knowledge Graph

The graph that builds itself from your work.

Every NCR you raise is already connected to the drawing it was pinned on, the ITP covering that zone, and the RFI that first surfaced the issue. The context that used to live in someone's head is now in the graph — permanently.

Auto-linked at creation

Pin a defect on the drawing. The NCR is already connected to the drawing revision, the ITP covering that zone, and the team responsible. Zero manual cross-referencing.

Spatial context embedded

Every document carries coordinates — grid reference, floor level, drawing revision. Context that lived in someone's head is now part of the graph.

Full project memory

Months later, when someone asks why a design changed or what caused rework, the answer is a search — not a meeting to reconstruct the story.

CLASHPipe · Beam · Level 3RFI8RFIsNCR4NCRsITP12ITPsLKA3LookaheadLOG7Site DiarySAF2SafetyCHK6ChecklistsINS5Instructions⚠ RISK DETECTEDRFI-042 · 14d unansweredBlocks Level 3 pour · $36k/day⚡ AI drafting response now...LIVE
Traceability

Every decision, every sign-off. Nothing lost.

Every pin has coordinates. Every NCR has a timestamp, a photo, and a drawing link. When a dispute comes six months later, the answer is a search — not a reconstruction.

Every action timestamped

Who did what, on which drawing revision, at exactly what time. Not approximated. Not reconstructed from memory.

Evidence immutably archived

Photos, sign-offs, and witness records are part of the graph — not floating in someone's camera roll.

Handover complete by default

When the project closes, the entire evidence trail is already assembled. No scramble. No disputed defects.

Evidence Trail · NCR-003

Rebar spacing · Level 3 · Grid B1

100% traced
NCR

NCR-003 Raised

M. Torres · 14 Mar · 10:34am

S-204 Rev C2 · Grid B1 · Level 3

Rebar spacing non-conformant — ITP-12 linked automatically

ITP

ITP-12 Witness Complete

P. Nguyen · 14 Mar · 11:45am

Hold point H3 cleared · photo attached

Signed off on-site · linked to NCR-003

CAR

CAR Submitted

J. Reyes · 14 Mar · 3:20pm

Corrective action: rebar spacing rectified

2 photos · contractor sign-off attached

CLOSED

NCR-003 Closed

QA Manager · 15 Mar · 9:10am

Full trail: 4 events · 3 docs · 2 photos

Audit-ready · archived with handover package

Handover-ready · Dispute-proof · Searchable forever

Project Outcomes

What connected projects
look like.

Blockers surface earlier. Evidence is automatic. Handover is already done.

Earlier blocker detection

AI surfaces blockers days before trades idle.

Faster NCR resolution

Auto-linked sign-offs and photos close NCRs in hours, not weeks.

The pour that didn't stop.

RFI-042 flagged on day 3. Response drafted, team notified — before the delay hit.

Pour delay cost avoided

Handover built passively

Already in the graph. Handover is a search, not a scramble.

Less time searching for data

Drawings and RFI threads findable in seconds, not buried in email.

Dispute resolved in 60 seconds.

NCR-003 auto-linked its ITP, CAR, and photos. When the dispute came, the full trail was one search.

Dispute answered without reconstruction

Scenarios illustrate real coordination failure patterns. Industry: 28% of time lost to rework, 18% searching for data (Procore, 2024).

Early Access

Get in early.
Help shape what ships.

We onboard teams in small batches so we can set each one up properly — not just hand over credentials. Applications are reviewed personally.

Onboarding call within 48 hours — we set you up on your first active project, not a sandbox
No migration needed — connect one project, see value on day one
No setup fees during early access
Direct line to the product team — your feedback shapes what ships next

Get free trial

We'd love to hear from you. We respond within 48 hours.

Your role

Project type (pick any)

We'll reply within 48h

or email directly at manish.gupta@setubase.com